•  Request for Environmental permit for facility Standard closing and Waste management plan (2015)
  • Compliance Plan with a request for extension of the Environment permit for Klejton with Waste management plan (2015)
  • Compliance Plan for the purpose of obtaining Environmental permit for expansion of production facility Drvoprodukt with Waste management plan (2015)
  • Compliance Plan for the purpose of extension of Environmental permit for heating plants in Travnik and Novi Travnik with Waste management plan (2015)
  • Request for Environmental permit for bolier room of residental settlement “OKI Dobrinja” with the Waste management plan (2015)
  • Technological feasibility study for the sanitary landfill Trešnjica in BPK (2015)
  • Manual for calculation of annual emissions of sulphur dioxide (SO2), particular matter (PM10) and nitro dioxide (NO2) (2014-2015)
  • Update of the Registry of pollutants emission into air and determining air quality level for Canton Sarajevo (2014 – 2015)
  • Request for environmental permit and Waste management plan for 11 (eleven) landfills which have been built during the Construction of Corridor Vc section Butile – Vlakovo LOT 3A and section Vlakovo – Tarčin (2014)
  • Ecoremediation for Environmental Protection and Development of the Una-Sana Canton (2014)
  • Environmental Impact Assessment for “Terme Ilidža” (2014)
  • Project for establishment of the “Centres for recovering and recycling of CFC and HCFC refrigerants  in Bosnia and Herzegovina” (2014)
    • Compliance Plan for BH Telecom for obtaining environmental permit (2014)
    • Strategic Impact Assessment of Federation BiH – Royal Dutch Shell (2014)
    • Environmental and Social Audit Report, Environmental and Social Action Plan, Stakeholder Engagement Plan, Environmental and Social Analyses of the district heating system in municipality of Pale, Bosnia and Herzegovina (2013)
    • Construction waste management plan for the project of rehabilitation and reconstruction of the stadium for a quick slide Zetra for IPSA INSTITUT (2013)
    • Design of construction waste managing and construction material stockpiles for highway Lašva – Donji Vakuf, station Lašva – interchange Nević Polje,  subsection: interchange Kaonik – interchange Vitez for IPSA INSTITUT (2013)
    • Plan activities for a purpose of providing environmental permit for facilities MEDIMPEX (2013)
    • Environmental and Social Due-Diligence (ESDD) Gap Analysis Report for HPP Ulog, Bosnia and Herzegovina, against EBRD Environmental and Social Policies (2012);
    • Environmental Impact Assessment Study for HPP Ustikolina, Bosnia and Herzegovina (2011-2012);
    • Registry of pollutants emission into air for Canton Sarajevo (2011 – 2012)
    • Environmental Impact Assessment for Landfill rehabilitation in Gradačac (2012)
    • Construction Waste Management Plan for Bosnalijek (2012)
    • Design of construction waste managing and construction material stockpiles for highway Lašva-Donji Vakuf, station Lašva-petlja Nević Polje, subsection 2: Kaonik-Vitez for IPSA INSTITUT (2012)
    • Design of construction waste managing and construction material stockpiles for Orašje (river Sava) – Tuzla (Šićki Brod) for JP Autoceste (2012)
    • Design of construction waste managing and construction material stockpiles for highway: Svilaj – Vukosavlje (section 1 i section 2) for JP Autoceste (2012)
    • Waste Management Plan for station of  highway Orašje (river Sava) – Tuzla (Šićki Brod), for LOT 2,3,4 i 5 station Brčko – Tuzla for JP Autoceste (2012)
    • Design of construction waste managing and construction material stockpiles for highway: Orašje (river Sava) – Tuzla (Šićki Brod), for LOT  2,3,4 i 5, dionica Brčko – Tuzla za JP Autoceste (2012)
  • Design of construction waste managing and construction material stockpiles for highway:  Orašje (river Sava) – Tuzla (Šićki Brod), for LOT 1, station Orašje – Brčko for JP Autoceste (2012)
    • Plan activities for KJKP GRAS d.o.o. Sarajevo
  • Design of construction waste managing and construction material  for facility for the production of liquid and semi-solid form of Non-Sterile medicines for Bosnalijek (2012)
    • Environmental Monitoring on the construction of the Highway  on Corridor Vc – tunnel Vijenac (2011 -)
    • Elaborate for waste disposal during discharging of water from the accumulation lake of  HE Rama (2011)
    • Construction Waste Management Plan for construction of object „CP-lateral toll in Kakanj“ (2011)
    • Construction Waste Management Plan for the project Highway on Corridor Vc, section „Lepenica – Tarčin“ (2011)
    • Environmental monitoring during Sarajevo Bypass construction (2011)
    • Construction Waste Management Plan for Coca Cola (2011)
    • Collecting and processing of packaging register (2011)
    • Request for environmental permit for demolition of Žica d.d. Sarajevo (2011)
    • Preparation of HCFC Phase-out Management Plan in Bosnia and Herzegovina (2010 – 2011)
    • Environmental Monitoring on the construction of the Highway  on Corridor Vc – section Kakanj-Biljesevo (2010 -)
    • Waste Management Plan for “SARAJKOMERC” in Gornji Vakuf Uskoplje (2010)
    • Waste Management Plan for “SurTEC Eurosjaj” in Konjic (2010)
    • Waste Management Plan for “Unisgal” in Konjic (2010)
    • Waste Management Plan for construction waste for storage building  AERODROM SARAJEVO, Sarajevo (2010)
    • Waste Management Plan for construction waste for waste water treatment plant in AERODROM SAREJVO, Sarajevo (2010)
    • Preparation of an Environmental Management Plan and  Environmental Assessment Outline for  Ilidza State Prison BiH (2010)
    • Preparation of the Environmental Impact Assessment Study for the Waste Water Treatment Plant in Konjic (2010)
    • Preparation of the Environmental Impact Assessment Study for the  Waste Water Treatment Plant in Bosanski Petrovac (2010)
    • Plan activities for a purpose of providing environmental permit for facilities BAGS (TermalPlant), Sarajevo (2010)
    • Plan activities for a purpose of providing environmental permit for facilities SARAJEVOPUTEVI, Sarajevo (2010)
    • Plan activities for a purpose of providing environmental permit for facilities DOBOJPUTEVI, Doboj Jug/Matuzici(2010)
    • Plan activities for a purpose of providing environmental permit for facilities
    • Review of the Safety at Work documentation, the environmental policy manual and the Master Plan for fire protection in accordance with IFC standards, Gintasmont, Montenegro (2009)
    • Waste Management Plan for “UNIS ENERGETIKA” in Travnik ans Sarajevo (2009)
    • Preliminary Environmental Impact Assessment Study for Hydro Power Plant Vranduk, JP EPBIH (2008 – …)
    • Preliminary Environmental Impact Assessment Study for Thermal Power Plant Kakanj block 8, JP EPBIH (2008-…)
    • Request for environmental permit for Chairlifts (Bjelasnica), ZOI84 (2009)
    • Preparation of the Environmental Impact Assessment Study for the Stanari Lignite Mine in accordance with EBRD directives in cooperation with DAPPOLONIA Italy, EFT Group (2009)
    • Plan activities for a purpose of providing environmental permit for saw-mill Alba Uniprom (2009)
    • Plan activities for a purpose of providing environmental permit for facilities on Bjelasnica, Igman and Zetra (2009)
    • Plan activities for a purpose of providing environmental permit for Radava quarry, Fojnica (2009)
    • Preliminary Environmental Impact Assessment Study for Hydro Power Plant Ustikolina, JP EPBIH (2009…)
    • Plan activities for a purpose of providing environmental permit for furniture factory “Standard” (2009)
    • Environmental and Social Impact Assessment Study for the Bar-Boljari highway (section Smokovac – Mateševo) in accordance with IFC/WB (2009)
    • Preliminary Environmental Impact Assessment Study for Hydro Power Plant Ulog, EFT Group (2009)
    • Environmental and Social Action Plan for International Airport Sarajevo in accordance with EBRD directives in cooperation with SEA Aeroporti di Milano (2009)
    • Environmental protection part for the purpose of Urban approval issuing for “Sadex sljako beton” (2009)
    • Local environmental action plan – LEAP, Municipality of Kakanj (2008-2009)
    • Action plan with measures to improve the environment in the Municipality of Kakanj (2008-2009)
    • Request for environmental permit for SA-DUNDEE GROUP (2008)
    • Preparation Request for an Environmental permit for Evropa Hotel Sarajevo (2008)
    • Study on vulnerability of FBiH area (2007)
    • Environmental Strategy of Federation of Bosnia and Herzegovina (2007)
    • Environmental Impact Assessment Study for Thermal Power Plant Stanari 410 MW (for local environmental permit) (2006-2008)
    • Environmental Impact Assessment Study for Thermal Power Plant Stanari 410 MW(for international finance institution) (2006-2008)
    • Plan activities for a purpose of providing environmental permit for sawmill „Klejton“ (2007)
    • Study of ziro – state of environment for Volkswagen Sarajevo (2007)
    • Conditions required for environment protection for purpose of Airport Hotel construction (2007)
    • Measurement of noise level for KJKP Sarajevogas (2007)
    • Request for environmental permit and Report on safety state for LPG storage for Istrabenz Plini (2007)
    • Plan activities for a purpose of providing environmental permit for quarry “Bosnaputevi” (2007)
    • Study of environmental state for EUFOR Base in Ortiješ – Mostar (2007)
    • Preparation of part of Waste Management Plan for Zenica – Doboj Canton (2007)
    • Plan activities for a purpose of providing environmental permit for “UNIS ENERGETIKA” Sarajevo and Travnik (2007)
    • Conditions required for environment protection for bakery SELMANOVIĆ (2007)
    • Conditions required for environment protection for pie – bakery AS (2007)
    • Elaborate on influence of electromagnet radiation of GSM/UMTS base stations on human health and environment, for BH Telecom (2007)
    • Project of remediation in area of lead smelter TESLA Brčko (2007)
    • Preparation Request for Preliminary Environmental Impact Assessment construction parks wind plants installed capacity of 60 MW, at three micro locations on areas of Podvelezje VJETROENERGETIKA BH (2007) 
    • Plan activities for a purpose of providing environmental permit for lead smelter Tesla Brcko (2006)
    • Development documentation for a environmental permit to Grand Media Center for Holiday Inn 
    • Environmental impact study for multinational force base EUFOR in Butmir (2006)
    • Preparation of Request for a Preliminary Environmental Impact Assessment and Environmental Impact Assessment Study for section of highway Kakanj – Visoko.
    • Participation preparation of request for a Preliminary Environmental Impact Assessment and Environmental Impact Assessment Study for  LOT2 of corridor VC (2005-2006)
    • Preparation Request for a Preliminary Environmental Impact Assessment construction parks wind plants under 300 MW installed power at several micro locations on broader areas of Podvelezje, with optimal installed power from 42 MW for faze I (2005)
    • Preparation Request for an Environmental permit for a boiler room at JU Hospital ‘’Prim. Dr. Abdulah Nakas’’ (2006)
    • Preparation Request for an Environmental permit for a boiler room at Clinic (2005)
    • Preparation Request for an Environmental permit for  Coca-Cola HBC Sarajevo (2005)
    • Preparation Request for an Environmental permit for a soft polyurethane foam product factory ‘’Delibasic  polyurethanes’’ Kakanj (2005)
    • Plan activities development for accident and disaster prevention for a toluenediizocianate storage (TDI) permit for a soft polyurethane foam product factory ‘’Delibasic  polyurethanes’’ Kakanj (2005)
    • Preparation of Request for an estimate of environmental impact for part of highway from Kakanj to Visoko.
    • Preparation of Request for issuing an environmental license for Concrete Plant – Kunovac
    • Environmental Impact Assessment  Study for FERPLAST Sarajevo (production of plastic bags) 
    • Technology-Economic Study of Commercial Refrigerants Production Revitalization Revitalization in «SLATKOM  alfa & omega», Banja Luka (2004)
    • Elaborate for environmental protection for stack construction  – Bakery Novi Grad (2004)
    • EIA Study for MEGATTI Hrasnica (production of water-based dispersion paint and liquid detergents) (2003) 
    • Study on environmental protection for quarry “Granitmont” Jablanica (2003) 
    • Study on environmental protection for Factory for final stone processing Granitmont Jablanica (2003)
    • Study “Environmental aspects of planned activities in KJKP TOPLANE SARAJEVO, as background for applying for international financial support” (2003)
    • Fusibility study and basis of the project of technological reconstruction of PUR foam production plant in company “Stirokart”, Srbac, Bosnia and Herzegovina, with introduction of environmentally sound technology (2002)
    • Propane-butane Refilling Station, TPO Vitkovici, Gorazde (2002)
    • Reconstruction of existing water supply system on the River Usora, Jelah (2002)
    • EIA KJKP TOPLANE SARAJEVO (2002)
    • Air quality assurance in the Kakanj municipality area
    • Fusibility study and basis of the project of technological reconstruction of PUR foam production plant in company “Stirokart”, Srbac, Bosnia and Herzegovina, with introduction of environmentally sound technology (2002)
    • Mini Sawmill Euroholz, Ilijaš (2001)
    • Cartridge Recycle Plant, Whitefield, Zenica (2001)
    • Fish Processing Plant “Norfish Blagaj”, Salakovac (2001)
    • Gravel Separation Plant “Diva Grabovica”, Prominvest Konjic 
    • Motorway Sarajevo – Zenica, subsection Josanica – Semizovac
    • Concrete Plant, Dom Breza – Ilijaš 
    • Petrol Station Bare, Sarajevo 
    • Concrete Plant Rajlovac 
    • Plant for scooping water from the River Bosna, Sarajevo (2000)
    • Natural Condition and Environmental Survey for Transport Master Plan in Bosnia and Herzegovina (2000) 
    • Paints and Coats Plant “Megati” Ilijaš(2000)